CSC/ECE 517 Fall 2021 - E2149. Finish Github metrics integration - Reputations: Difference between revisions
No edit summary |
|||
Line 2: | Line 2: | ||
==Methodology== | ==Methodology== | ||
The team has synced the revised 2021 Spring project E2111 code with the current status of the Expertiza/beta branch and has begun analyzing the existing code. Prior customer feedback has advised the team to address inextensibility/coupling issues, documentation issues, and synchronization issues. We are performing our own end-to-end analysis of the code in addition to this feedback, and have so far found numerous action items. We have separated these action items into Primary and Secondary objectives: Primary objectives are "must-haves" that need to be addressed before the existing code is mergeable. Secondary objectives are "nice-to-haves," or features that were either left out of the original project or would make the integration display more complete. | |||
==Design Patterns== | ==Design Patterns== |
Revision as of 01:38, 3 November 2021
Abstract
Methodology
The team has synced the revised 2021 Spring project E2111 code with the current status of the Expertiza/beta branch and has begun analyzing the existing code. Prior customer feedback has advised the team to address inextensibility/coupling issues, documentation issues, and synchronization issues. We are performing our own end-to-end analysis of the code in addition to this feedback, and have so far found numerous action items. We have separated these action items into Primary and Secondary objectives: Primary objectives are "must-haves" that need to be addressed before the existing code is mergeable. Secondary objectives are "nice-to-haves," or features that were either left out of the original project or would make the integration display more complete.