CSC/ECE 517 Fall 2020: Difference between revisions
Jump to navigation
Jump to search
Line 28: | Line 28: | ||
* [[CSC/ECE 517 Fall 2020 - E2075. calibration submissions should be copied along with calibration assignments]] | * [[CSC/ECE 517 Fall 2020 - E2075. calibration submissions should be copied along with calibration assignments]] | ||
* [[CSC/ECE 517 Fall 2020 - E2076. Allow users to create an account and submit work to an "assignment" (e.g., for conference reviewing)]] | * [[CSC/ECE 517 Fall 2020 - E2076. Allow users to create an account and submit work to an "assignment" (e.g., for conference reviewing)]] | ||
* [[CSC/ECE 517 Fall 2020 - E2080. Track the time students look at other submissions]] |
Revision as of 06:00, 22 October 2020
Writing Assignments
- CSC/ECE 517 Fall 2020 - E2070. Refactor response_controller.rb
- CSC/ECE 517 Fall 2020 - E2068. Refactor quiz_questionnaires_controller.rb
- CSC/ECE 517 Fall 2020 - E2062. Add test cases to review_mapping_helper.rb
- CSC/ECE 517 Fall 2020 - E2063. Refactor tree-display.js and tree_display_controller.rb
- CSC/ECE 517 Fall 2020 - E2064. Refactor reputation_web_service_controller.rb
- CSC/ECE 517 Fall 2020 - E2065. Fix view in student_task/list page
- CSC/ECE 517 Fall 2020 - E2066. Refactor lottery controller.rb
- CSC/ECE 517 Fall 2020 - E2067. Refactor student_teams_controller.rb
- CSC/ECE 517 Fall 2020 - E2073. Refactor course_controller.rb
- CSC/ECE 517 Fall 2020 - E2057. Restrict TAs’ ability to change their own grade and limit file-size upload
- CSC/ECE 517 Fall 2020 - E2052. Remove multiple topics at a time
- CSC/ECE 517 Fall 2020 - E2052. Remove multiple topics at a time
- CSC/ECE 517 Fall 2020 - E2056 Account_Request_Controller.rb
- CSC/ECE 517 Fall 2020 - E2059. Email notification to reviewers and instructors.rb
- CSC/ECE 517 Fall 2020 - E2058. Two issues related to assignment management
- CSC/ECE 517 Fall 2020 - E2071. Improve assessment360_controller.rb
- CSC/ECE 517 Fall 2020 - E2054. Auto generate submission directory names based on assignment names
- CSC/ECE 517 Fall 2020 - E2060. Review report should link to the usual view for reviews
Final Project Design Documents
- CSC/ECE 517 Fall 2020 - E2082. Track time between successive tag assignments
- CSC/ECE 517 Fall 2020 - E2078. Improve self-review Link peer review & self-review to derive grades
- CSC/ECE 517 Fall 2020 - E2083. Revision_planning_tool_E2016
- CSC/ECE 517 Fall 2020 - E2085. Allow reviewers to bid on what to review
- CSC/ECE 517 Fall 2020 - E2086. Let course staff as well as students do reviews
- CSC/ECE 517 Fall 2020 - SQLFE. Refactor Submission.java
- CSC/ECE 517 Fall 2020 - E2075. calibration submissions should be copied along with calibration assignments
- CSC/ECE 517 Fall 2020 - E2076. Allow users to create an account and submit work to an "assignment" (e.g., for conference reviewing)
- CSC/ECE 517 Fall 2020 - E2080. Track the time students look at other submissions